Majestice is a professional leader Majestice® China High frequency welded intercooler tube manufacturer with high quality and reasonable price. Welcome to contact us.Nanjing Majestic is one of the largest manufacturers of aluminum tubes in China, established in 2007 and located in Nanjing, Jiangsu Province, China. We design and manufacture all kinds of aluminum tubes,such as high frequency welded radiator tube, high frequency welded intercooler tube,high frequency welded condenser tube,extruded aluminum tube ect. We have kinds of catalog for you to check,also can custom tubes with your drawing. If any needs, welcome to contact us.
Our aluminum high frequency welded intercooler tube is manufactured with high precision and extremely low tolerances to meet the specific requirements of customers, and we can use various alloys to manufacture welded tubes of various sizes and shapes. For specific size information, you can check our product catalog, welcome to contact us.
2.Product Parameter (Specification)
high frequency welded intercooler tube(Height*R*Thickness) |
|
30*7.6*0.266 |
62*10.1*0.45/0.50 |
32*7.6*0.26/0.28/0.30 |
64*7.6*0.45 |
40*8.08*0.40/0.45 |
64*7.88*0.45 |
40*8 *0.45 |
64*8.08*0.45/0.50 |
48.5*4.3*0.40 |
80*7.6*0.40/0.45 |
65.15*4.6*0.4 |
80*7.88*0.40/0.45 |
50*7.6*0.45 |
80*8.08*0.40/0.45 |
50*7.88*0.45 |
50*8.08*0.45 |
More specification you can email us... |
3.Production process of Majestice® High frequency welded intercooler tube
Step 1: the vacuum suction cup is loaded with aluminum tape: the vacuum suction cup reduces the knock and touch caused by manual operation.
Step 2: Tube forming: The flat strip is made into an almost final tube through the forming roller and introduced into the welding station
Step 3: Welding: There is no or very few sparks when the soldering station is produced
The fourth step: cooling: cooling with cold water
Step 5: Gua Sha: Two independent movable scrapers can reduce the height of the weld and smooth its surface.
Step 6: Calibration: After scraping, it is calibrated by the calibration roller.
Step Seven: Cutting
Step 8: Label and place neatly on the pallet
4.FAQ
Q: Are you a trading company or manufacturer?
A: Yes,we are a factory with more than 12 years history in this industry.
Q: What is your terms of payment?
A: Normally,we accept 30%deposit,70%before shipment. If you have advise,don't hesitate to ask.
Q: How long does it take for samples and mass production?
A: Usually it will take 15-20 days for new molds;After confirmation, 25-30 days for mass production.This is based on your order and requirement